|
Our Clients
MR
DE has an extensive client exposure with a history in many
industries including Utilities, Mining, Transport, Defence, and
State Government Departments.
Our
current clients are:
- Tarong Energy Corporation
- Tarong
North Power Station

Testimonials
MR
DE Pty Ltd has played a key role in consolidating Ellipse
functionality at Tarong Energy. John and Craig’s collaborative approach when working with
our internal support team, our customer base, and Mincom, has
allowed the Corporation to focus on maximizing the benefits of an
integrated enterprise application environment.
Reference Statement:
Tarong
Energy went live with Ellipse on 1 July 2001. At this point the Corporation
was faced with the reality of simultaneously changing its
legacy core applications to an integrated suite covering the
following functions:
- Permit-to-Work
- Maintenance
- Human
Resources
- Supply
- Finance
- Payroll
- Accounts
Payable
Such
a change required both organizational commitment and focused
support during the transition-to-stability phase.
MR
DE Pty Ltd was engaged in December 2001 to help stabilize Ellipse
through initiatives such as:
- Reducing
the backlog of general Ellipse queries
- Reducing
the backlog of Ellipse work orders
- Developing
a cross-functional Ellipse support framework
During
MR DE’s six-month engagement the backlog of general queries and
Ellipse work orders has been reduced by over 60%. This impressive effort has given Tarong Energy the
opportunity to lock-in support practices and devote more time to
continuous improvement initiatives and the expansion of Ellipse
into new business initiatives such as Tarong North and Starfish
Hill.
MR
DE has been engaged for a further six months to facilitate the
implementation of Ellipse at Tarong North and lock-in the work
practices surrounding Ellipse support.


An
introduction to Tarong Energy
Tarong
Energy is a Queensland Government Owned Corporation. It owns
assets at both ends of the interconnected electricity and gas
markets including:
-
The
1400MW (4 x 350MW) coal-fired Tarong Power Station;
-
The
500MW (2 x 250MW) pumped-storage hydro-electric Wivenhoe Power
Station;
-
A
15MW gas turbine on the Tarong site; and
-
Terra
Gas Trader (TGT), a South Australian-based wholesale gas
trading business that trades more than 50% of the natural gas
in South Australia.
Tarong
Energy also owns the Glen Wilga coal resource near Chinchilla. The
single 450MW unit coal-fired Tarong North Power Station is under
construction and is scheduled to complete commissioning in early
2003.
On 18
April 2002, the Corporation announced its plans to construct South
Australia's first wind farm. This 34.5 MW plant will be developed
at a cost of $65 million.
For
more information: www.tarongenergy.com.au

|